BACK TO CASE STUDIES
26-28 Underwood Street, London
Stewart Watson provided both project and contract administration services to both:-
Phase 1 – Structural refurbishment and re-cladding of this 10,000 sq ft 1950s bomb-infill site, the Pyrolave cladding system and new and exposed M&E services, a newly orientated passenger lift accessing all levels including the roof level, new windows, new stair linking the ground floor and lower ground floor suites, and the provision of extensive cycling facilities, and;
Phase 2 – Installation of a rooftop extension using CLT (Cross Laminated Timber) construction.