Holborn Hall, 193-197 High Holborn, London

Posted on Leave a comment

Stewart Watson provided initial dilapidations advice on termination of a ten year lease and acted as designer and contract administrator on the reinstatement and dilapidations works to the 1st floor of this Listed building, including the introduction of LED lighting. To date Stewart Watson has undertaken similar works on all of the seven floors of […]

26-28 Underwood Street, London

Posted on Leave a comment

Stewart Watson provided both project and contract administration services to both:- Phase 1 – Structural refurbishment and re-cladding of this 10,000 sq ft 1950s bomb-infill site, the Pyrolave cladding system and new and exposed M&E services, a newly orientated passenger lift accessing all levels including the roof level, new windows, new stair linking the ground […]

Clerkenwell, London

Posted on Leave a comment

Stewart Watson managed the design and implementation of a major refurbishment of this commercial building, to create offices above a self-contained retail unit. Work included reconfiguration of the building interior, provision of a new fifth floor, restoration of the exterior and total refit of the interior, including new services installations.

The Paragon, Blackheath

Posted on Leave a comment

Stewart Watson was instructed as Contract Administrator and client liaison for the full external decoration of a Grade 1 listed building in Blackheath, London.  The work required detailed co-ordination as the building was fully occupied during the contract. The Contract Value was £450,000.

Bruton Street, Mayfair, London

Posted on Leave a comment

Stewart Watson designed and managed the strip-out and refurbishment of a number of floors within this property. Works included Cat A refurbishment, together with upgrading the reception and all of the WCs.

Old Broad Street, London

Posted on Leave a comment

Stewart Watson was instructed as Contract Administrator on a Cat A refurbishment of 604 m2 of office space in the City of London.  The works were carried out in the predominantly occupied building and comprised new services, floors, ceilings and replacement WC facilities. The Contract Value was £450,000 and completed within the eight week contract […]

Conduit Street, London

Posted on Leave a comment

Stewart Watson was instructed to Project Manage the Cat A Refurbishment of this Central London commercial property.  The refurbishment included new Mechanical, Electrical and Public Health services, including new passenger lift.  The contract Value was £840,000 and the contract period was 24 weeks.

Test Project management

Posted on Leave a comment

WordPresslogin/dashboard. usermanagement/passwords. Viewing site in ‘edit mode’. updating text on existing pages. adding a new page with text and images. editing overall category page (‘what we do’). images galleries on ‘case study’ pages (meta slider). adding a new case study ‘post’ page with image and details.

Brentford

Posted on Leave a comment

Stewart Watson prepared terminal schedules of dilapidations and negotiated a settlement on this 13,000m2 mixed office and industrial estate in West London on behalf of the landlord.

Westminster, London

Posted on Leave a comment

Stewart Watson undertook a building survey of this West End estate comprising eleven office and retail buildings totalling 8,100m2 on behalf of a purchasing investor.  Input included coordination of specialist surveys of the services installations.